Granny flats and small second dwellings.

What most people call a granny flat is a small second dwelling. Since 15 October 2026 the planning rules allow up to 80 m², while the Building Regulations 2018 still set 60 m². A planning permit may not be required, however a building permit is always required.

PermitRequired
WhereAll of Victoria
Call(03) 9113 6088

What changed on 15 October 2026

Amendment VC306 changed the Victoria Planning Provisions and every planning scheme in Victoria on 15 October 2026. For small second dwellings it:

  • raised the maximum floor area from 60 m² to 80 m²
  • changed how floor area is measured: from the outside face of the external walls, or the centre of a party wall, and not counting unroofed patios, pergolas, porches and terraces, or roofed decks and verandahs attached to the dwelling
  • removed the planning requirement for an access path to the small second dwelling
The Building Regulations have not changed yet

The Building Regulations 2018 in force from 1 September 2026 still define a small second dwelling as a self-contained Class 1a building with a gross floor area of 60 m² or less. The Victorian Government says matching changes to the Building Regulations and Minister's Guideline MG-12 will follow. Until they do, a design between 60 m² and 80 m² can meet the planning definition but not the building one, so talk to us before your drawings are finalised and we will confirm which rules apply.

What counts as a small second dwelling

  • It is on the same lot as an existing house, and can be attached to it, detached, or a conversion of an existing building such as a garage.
  • It is self-contained, with a kitchen sink, food preparation facilities, a bath or shower, and a toilet and wash basin.
  • It cannot be subdivided or sold separately from the main house.
  • It cannot be connected to reticulated natural gas.
  • Anyone can live in it, and it can be rented out. Rental laws, including the rental minimum standards, apply.

When a planning permit is still needed

A small second dwelling is allowed in all residential and rural zones and normally does not need a planning permit there. One is still needed when:

  • the lot is less than 300 m² in a residential zone
  • the land is in the Rural Conservation Zone, Green Wedge Zone or Green Wedge A Zone
  • the land is in a rural zone that requires a permit for earthworks, or sets setbacks from waterbodies, roads or other dwellings
  • an overlay or another part of the planning scheme requires one

In a Heritage, Design and Development or Neighbourhood Character Overlay, no planning permit is needed if the building is no more than 5 m high and finished in muted tones and colours. No car parking is required, and development and infrastructure levies do not apply. Your planning property report shows the zone and overlays on your land.

In most cases we carry out the siting assessment as part of the building permit. If the lot is under 300 m² in a residential zone, the council assesses siting with the planning permit instead, against the same requirements.

Building rules that apply

  • It must be set back behind the front wall of the existing house that faces the front street, and porches, verandahs, eaves, decks over 800 mm high and similar items cannot extend into that setback (regulation 74A). A design that does not meet this needs the council's report and consent.
  • It needs its own private open space (regulation 86A) and a clear path from the front street (regulation 86B). The path is still a building requirement even though VC306 removed it from the planning rules.
  • The other Part 5 siting rules apply, including site coverage, permeability and, in the Neighbourhood Residential Zone and parts of the General Residential Zone, the minimum garden area.
  • It must meet the National Construction Code, including the Livable Housing Design Standard and the energy efficiency requirements, so it needs a house energy rating like any new home.
  • It is inspected at each mandatory stage, and needs an occupancy permit before anyone lives in it.

Other things to check

  • A section 173 agreement or a restrictive covenant on the title can stop or limit a second dwelling. Covenants are enforced by the neighbours who benefit from them, not the council.
  • Easements on the title may mean you cannot build over that part of the land.
  • Dependent person's units can still be applied for under the transitional rules in clause 52.04 until 28 March 2027. An existing, lawful one stays lawful.
  • A tiny home can be a small second dwelling if it meets the planning and building requirements. Council local laws may also apply.
  • Owner-builders can get a certificate of consent for a small second dwelling even if they had a building permit as an owner-builder in the last 5 years (regulation 19A).

Sources

From the Victorian Government: small second homes (Department of Transport and Planning), small second dwelling (Building and Plumbing Commission), and Amendment VC306.

Common questions

Do I need a building permit for a granny flat in Victoria?

Yes. Every small second dwelling needs a building permit, whether or not it needs a planning permit.

Do I need a planning permit for a granny flat?

Usually not in residential and rural zones. You do if the lot is under 300 m² in a residential zone, if the land is in a Rural Conservation or Green Wedge zone, or if an overlay or another part of the planning scheme requires one.

How big can a granny flat be in Victoria?

Since Amendment VC306 on 15 October 2026, up to 80 m² under the planning rules. The Building Regulations 2018 still set 60 m² until they are amended, so check with us before finalising a design over 60 m².

How is the floor area of a small second dwelling measured?

Under the planning rules, from the outside face of the external walls or the centre of a party wall. Unroofed patios, pergolas, porches and terraces, and roofed decks and verandahs attached to it, are not counted.

Can I rent out a granny flat?

Yes. Anyone can live in a small second dwelling, and it can be rented out. Rental laws, including the rental minimum standards, apply.

Can a granny flat be subdivided or sold separately?

No. A small second dwelling cannot be subdivided from the main house.

Can a granny flat have a gas connection?

No. Small second dwellings cannot be connected to reticulated natural gas.

Can I convert my garage into a granny flat?

Yes, if the converted building meets the definition of a small second dwelling, the planning scheme and the Building Regulations. It needs a building permit like a new one.

What is the difference between a granny flat and a bungalow?

A granny flat is self-contained, with a kitchen and bathroom. A bungalow has no kitchen and is used as an extra room for the main house. See our page on bungalow building permits.

Request a quote

Request a quote online, or email what you have to info@cortekgroup.com.au, and we will quote a fixed fee for your building permit. For the permit itself we will need:

  • The certificate of title and plan of subdivision, with any covenants or section 173 agreements
  • The council's property information under regulation 51(2), and its legal point of stormwater discharge
  • Drawings and specifications issued for construction
  • A soil report, and the engineer's drawings, computations and design certificate
  • A house energy rating report with the energy endorsed drawings
  • The planning permit and endorsed plans, if the project needs one
  • A bushfire assessment, if the site is in a bushfire prone area
  • A septic permit from the council, if the site is not sewered
  • If a builder is doing the work, the contract extract and, where it applies, the domestic building insurance certificate
  • If you are an owner-builder, your certificate of consent from the BPC, where one is required

The full list is in our building permit documentation checklist.